Maintenance, the challenge of making production resources more reliable

Maintenance, the challenge of making production resources more reliable
Planning maintenance work is a major step towards doing it right. The Ortec Group provides A to Z support for all the industrial plant shutdown projects.

Our expertises

Assignments

From cleaning equipment to major industrial plant shutdowns, the Ortec Group employs its ability to anticipate and to participate alongside its customers in preparing for industrial site maintenance, to optimise and to improve the reliability and performance of production resources. From advice to feedback analysis, our specialists use method and precision to support all stages.

Expertise and services
  • Definition and management of industrial maintenance
  • CAMM advice, deployment and training
  • Creation of processes, plans, work instructions, etc.
  • Reliability and optimisation studies for production resources
  • Continuous improvement studies (lean manufacturing, WCM)
  • MSG3 Maintenance Program
  • Industrial performance audit and consulting
  • Design, production and distribution of maintenance tools (GSE)
  • Implementation of feedback
Fields of activity
  • Industrial methods
  • Industrial maintenance

Focus

HISTORIC EXPERTISE IN SHUTDOWN SCHEDULING AND MANAGEMENT

A major maintenance shutdown is a bit like a Formula 1 race: time spent at a standstill must be minimised, continuously optimised in time, tools and organisation. Within Ortec, we have the experience and capability to manage these complex projects. We prepare for shutdowns two years in advance. Each project is assigned to an experienced manager. With a team made up of preparers in all building trades, the manager prepares budgets, anticipates equipment and human resource needs, and plans detailed actions to be carried out during interventions: each person involved must have all the elements that will enable him to work effectively. Precise advance organisation and rigorous scheduling of operations are the key to a successful major shutdown.

DIGITAL RECORDS SUPPORTING MAJOR SHUTDOWNS

At Ortec, we use digital technology to support major maintenance projects. Using the Digital Forms application, tablets are now replacing manual note-taking when recording information on site.
Available in real time and directly integrated into our databases, information is more easily accessible and easier to process when preparing for major shutdowns. A real asset to gain time, reliability and efficiency.

Our references

Total Donges

TOTAL: MAJOR INDUSTRIAL PLANT SHUTDOWN

Preparation of the 2015 major shutdown of the Total Donges refinery
EDF CPT

EDF: MAJOR MAINTENANCE PROJECT

Planning for maintenance of EDF CPT power station  
Naphtachimie

NAPHTA CHIMIE: MAJOR INDUSTRIAL PLANT SHUTDOWN

Preparation of the shutdown of the Naphta Chimie plant in Lavera  
Laboratoire production d'Insuline

LILLY: MAJOR MAINTENANCE PROJECT

Maintenance strategy for Lilly’s new insulin production line
EDF Barrage Hydraulique

EDF: MAJOR MAINTENANCE PROJECT

Planning of maintenance operations for 18 hydraulic structures for EDF DPH  
Solvay PVC

SOLVAY: MAJOR INDUSTRIAL PLANT SHUTDOWN

Preparation and planning to shut down the Solvay site at Jemeppe-sur-Ambre in Belgium (first PVC plant in Europe)
Vaccins

SANOFI: MAJOR INDUSTRIAL PLANT SHUTDOWN

Preparation and coordination for shutdowns of Sanofi vaccine production plants

Our markets

Our clients

Total
EDF
Lilly
Solvay
Sanofi
Arkema

Do you have a project?
Our team can help you